PROJECTS » Resources Management
Any activity brings about conflicts between meeting the process or development needs and safeguarding resources. AIS Environment uses appropriate Environmental Resource Management tools to identify these conflicts and helps manage the interaction and impact of the activity on the environment.
When applying these tools, AIS Environment aims to ensure that ecosystems and habitats are protected and maintained whilst maintaining ecosystem integrity through considering ethical, economic, and scientific (ecological) variables. Environmental Resource Management is thus linked to environmental protection and sustainability.
AIS prepared the Environmental Permitting application for MFF Ltd.; this work included three fish farms and two land-based facilities.
Waste Management Plan- Mqabba Quarry
Elbros Construction Ltd., commissioned AIS to prepare a WMP in relation to a disused quarry in Mqabba which has been proposed for use as a recycling f ...
Waste Management Plan – Hotel at Marsaxlokk
AIS prepared a WMP on behalf of Bilom Group regarding the proposed development of a 125 bedroom hotel (Class 3B), including all amenities and semi-bas ...
Mellieħa Holiday Centre EP
AIS prepared the Environmental Permitting application for the Mellieħa Holiday Centre; this work included the proposed extension of 30 bungalow units.
AIS Environment carried out a preliminary study of the current environmental state of Wied Blandun and an associated risk assessment to guide further ...
Green Public Procurement (GPP) Update
An assessment of the National Action Plan for Green Public Procurement procedures was carried out by AIS Environment, and recommendations for the seco ...
A biodiversity management plan to repair and restore the garigue habitat within the confinements of the Mellieha Holiday Centre, in relation to the ap ...
Proposed Petrol Station in Burmarrad – Air Quality Study
Baseline monitoring of the benzene concentration on the site for the proposed petrol station in Burmarrad was condu ...
The assessment of waste-to-energy technologies, economic feasibility, site assessment and the applicability of a waste-to-energy facility in Malta wer ...
In view of the proposed Sa Maison Yacht Marina, AIS Environment carried out a Marine Ecology Baseline Survey.
AIS Environment carried out the Environment Impact Statement, compiled the IPPC permit and undertook AIr Quality monitoring at Marsaxlokk & B'Bugia.
Monitoring of Nutrient Status and Eutrophication Status
Baseline surveys to monitor the nitrate concentrations and eutrophication levels in three coastal inlets and bays.
Waste Management Facility at Sant’ Antnin
Environmental Baseline studies for the upgrading of the recycling and composting plant treating non-hazardous non-inert domestic waste.
Waste Transfer Facility in Gozo
Environmental studies were carried out to assess the development of a Waste Treatment and Transfer Facility in Gozo.
National Waste Management Plan
Strategic Environmental Assessment was carried out on Malta's National Waste Management Plan.
Inland, Surface and Transitional Waters Baseline Surveys
AIS Environment carried out the first national baseline surveys for inland, surface and transitional waters across ...
An Environmental Impact Statement was required for the proposed construction of a new Secondary School and Sports Complex at Kirkop.
Assesments at the Grand Harbour and Mgarr Harbour
Noise surveys and Marine Ecological surveys were carried out for proposed development at the Grand Harbour and Mgarr Harbour.
Incinerator at the Public Abattoir
AIS Environment delivered an Environmental Planning Statement (EPS) for the upgrade of the Marsa Abattoir Incinerator.
Waste Management Facility at Għallis ta’ Ġewwa
Baseline environmental surveys were carried out for the Environmental Impact Assessment of a Waste Management Facility.
Storm Water Master Plan for the Maltese Islands
A Strategic Environmental Assessment was carried out to identify and assess the environmental implications of the proposed Plan.
Selective Collection of the Organic Waste in Tourist Areas
A pilot composting plant designed and appropriate collection systems promoted as part of the SCOW project.
Oil Tanking Malta increases storage capacity
An Environmental Planning Statement was required to identify and assess the environmental impacts of increasing storage capacity.
Proposed sports facilities/campus at MCAST
An Environment Impact Statement including environmental impacts and risks of the proposed development was required.
Coastal Water Baseline Surveys for the Maltese Islands
AIS Environment carried out the first national baseline surveys covering the Maltese coast.
Malta-Sicily Interconnector
The Interconnector required an Environmental Planning Statement, Construction Monitoring and Marine Environmental Monitoring.
Marine Scientific Surveys around Filfla for its Conservation
Marine Scientific Surveys were required to investigate the conservation potential in the sea around Filfla.
Windfarms at Hal Far, Wied Rini and Sikka l-Bajda
Environmental Impact Statements and Appropriate Assessments were carried out by AIS Environment for two onshore and one offshore windfarms in Malta.
AIS Environment carried out out a comprehensive audit of submitted figures for 2010 stack emissions from both Marsa & Delimara Power Stations